Nordic Mining #2
OldNick
15:29 16.12.2016
#18629

Hence, a higher garnet revenue potential compared with previous assumptions will be targeted as part of the ongoing PFS work.
______

Nordic Mining har visst lært av de andre børsnoterte selskapene uten særlig cash i kassa at rettede emisjoner til underkurs er den kvikkeste måten å skaffe seg mer cash på, og så heller gi litt f**n i de andre askjonærene.

Der bryter de et prinsipp de vel har holdt fast på til nå, ny-emisjoner til eksisterende aksjonærer med tilhørende tegningsretter. Men, det tar nok for lang tid og mye arbeid.

De begrunner det med at de har fått tak i "kvalitetsinvestorer", som sikker tliker å få billig-aksjer på beskostning av "saueflokken".

Tigerstaden AS høres jo unektelig flott ut hva?

NOM.OAX: Completed Private Placement

Børsmelding
16.12.2016

Nordic Mining is pleased to inform the completion of a Private Placement of 8 620 000 shares to four selected institutional and professional investors. Gross proceeds from the Private Placement are approximately NOK 26.7 million. Nordic Mining ASA (the "Company") has completed a Private Placement of 8 620 000 shares at a subscription price of NOK 3.10 per share. The share issue equals close to 10% of the Company's share capital. Gross proceeds from the Private Placement are approximately NOK 26.7 million.

The proceeds from the Private Placement will be used primarily to finance feasibility studies for the Engebø rutile project, potential follow-up investments in Keliber Oy and general corporate purposes.

The shares have been issued to the following four institutional and professional investors:

- Spencer Trading AS
- A London based asset management fund
- Alden AS
- Tigerstaden AS

The shares will be issued in two tranches. The first tranche comprises of 6 378 666 shares which are remaining under the authorization given by the Company's general meeting 18 May 2016. The first tranche of shares is expected to be registered on or about 21 December 2016. Following the registration of the first tranche resolved by the board of directors, the new share capital of the Company will be NOK 55 550 480.40 divided on 92 584 134 shares each with a nominal value of NOK 0.60.

The second tranche comprises of 2,241,334 shares which will remain subject to the approval by an Extraordinary General Meeting (the "EGM"). The EGM is expected to be held on or about 10 January 2017.

The Board has assessed the Private Placement in light of the equal treatment requirement, balanced the considerations that speak for and against carrying out the Private Placement. Taking into account that the Company through the Private Placement succeeds in attracting quality investors, obtaining funds for prioritised projects, timing implications and costs, the Board concluded that the waiver of the preferential rights in the Private Placement was considered necessary in the interest of time and successful completion in the common interest of the Company and its shareholders.

Clarksons Platou Securities AS has acted as Sole Manager and Bookrunner in the Private Placement.

For further information, please contact:
Lars K. Grøndahl, CFO, telephone +47 9016 0941

Oslo, 16 December 2016
Nordic Mining ASA
Nordic Mining ASA (www.nordicmining.com)
OldNick
12:18 23.12.2016
#18663

NOM.OAX: Innkalling til ekstraordinær generalforsamling 10. januar 2017

Børsmelding
19.12.2016

Ekstraordinær generalforsamling i Nordic Mining ASA avholdes 10. januar 2017 kl. 16:30 i selskapets lokaler i Vika Atrium, Munkedamsveien 45 (oppgang A, 5.etg), 0250 Oslo. Styret foreslår at generalforsamlingen vedtar en rettet emisjon. Det vises i den anledning til børsmeldingen som ble publisert 16. desember 2016.

Innkallingen til ekstraordinær generalforsamling med agenda (på norsk og engelsk) er vedlagt denne meldingen. Dokumentene vil også være tilgjengelig på selskapets hjemmeside www.nordicmining.com.

Ved spørsmål, vennligst kontakt:
CFO Lars K. Grøndahl, Tel: 9016 0941

Nordic Mining ASA (www.nordicmining.com)
______

NOM.OAX: Notification of share purchase

Børsmelding
23.12.2016

Board member Mari Thjømøe has today through the company ThjømøeKranen AS purchased 27 000 shares in Nordic Mining at a price of NOK 3.70 per share.

ThjømøeKranen AS owns 78 797 shares in Nordic Mining prior to the purchase.

Nordic Mining ASA

Endret 23.12.2016 12:21 av OldNick
tjuagutt
13:12 24.12.2016
#4400

Ønsker alle sammen en riktig fredfull og God Jul :)
Rally
14:58 24.12.2016
#6288

Samme her ;-) God Jul til alle. :-)
OldNick
09:00 19.01.2017
#18745

Meldingen fra NOM


NOM.OAX: ESA has closed complaint cases regarding Engebø tailings deposit

Børsmelding
18.01.2017

Today, ESA ("EFTA Surveillance Authority") has informed that it has closed three complaint cases against Norway's permitting of the tailings disposal for the Engebø rutile project. ESA's press release in English and Norwegian is available at: http://www.eftasurv.int/press--publications/press-releases/internal-market/internal-market-esa-closes-complaint-cases-against-norwegian-mining-decisions

CEO Ivar S. Fossum comments: "ESA's closing of the complaints was expected and confirms that Norway's decision-making process related to the permitting has been conducted within the requirements set out in the European Water Framework Directive. We are pleased with ESA's statement that the complaints are closed. The clarification underpins the assessment of sea disposal as a viable and environmentally safe solution for the project."

Nordic Mining currently carries out a pre-feasibility study ("PFS") for the Engebø project. The scope of the PFS includes description and assessment of relevant aspects of the project. The plan is to complete the PFS in Q2 2017.

For further information please contact:
CEO Ivar S. Fossum, telephone +47 9309 6850.

Oslo, 18 January 2017
Nordic Mining ASA
Nordic Mining ASA (www.nordicmining.com)
OldNick
15:44 23.01.2017
#18760

Nordic Mining har fått forlenget utvinningstillatelsen sin for Engebø-prosjektet sitt, som nå vil utløpe i Nov-2027.

NOM.OAX: Extended extraction permits for the Engebø rutile project

Børsmelding
23.01.2017

The Norwegian Directorate of Mining has extended the extraction permits for the Engebø rutile project with 10 years from 12 November 2017. Consequently, the expiry date for the extraction permits is now 12 November 2027. The extraction permits are held by Nordic Mining's wholly owned subsidiary, Nordic Rutile AS.

The Directorate underpins that comprehensive exploration and resource mapping has been undertaken for the project and that the feasibility process is ongoing. The Directorate acknowledges that an extension is needed to carry out the feasibility work program.

Nordic Mining currently carries out a pre-feasibility study ("PFS") for the Engebø project. The scope of the PFS includes description and assessment of relevant aspects of the project. The plan is to complete the PFS in Q2 2017.

For further information please contact:
MD Nordic Rutile, Thomas B. Addison, tel: +47 9712 1339

Oslo, 23 January 2017
Nordic Mining ASA
Nordic Mining ASA (www.nordicmining.com)
Rally
09:21 26.01.2017
#6315

NOM børsmelding
9.04 AM CET / 26-Jan-2017 / Nordic Mining ASA (OAX:NOM)
Keliber has signed Outotec for basic engineering of the lithium plant
Nordic Mining's associated company Keliber has signed a basic engineering contract with Outotec for the lithium plant. The engineering contract comprises mineral processing and lithium carbonate production. The engineering work will provide important information including capex and opex estimates for Keliber's ongoing definitive feasibility study.
Keliber and Outotec sign Basic Engineering Contract

Endret 26.01.2017 09:21 av Rally
Rally
12:12 05.02.2017
#6323

Gode priser på rutil
Nordic Mining er i full gang med sitt mulighetsstudium på rutilforekomsten i Engebøfjellet.
Utsiktene i rutilmarkedet er positive, skriver Nordic Mining. Utenlandske analytikere estimerer en prisvekst på 7,5% i de kommende årene. Bakgrunnen er at produksjonsperioden nærmer seg slutten for flere av de mindre produsentene.

En ny langsiktig produsent i Norge vil derfor passe bra i det internasjonale forsyningsbildet, skriver selskapet.

Nordic Mining foretar nå et mulighetsstudie på forekomsten, og i den forbindelse blir det gjort omfattende prosesstesting. Selskapet forsøker både våt- og tørseparering for å utvikle et rutilkonsentrat.

Det er også igangsatt forsøk med separering av granat som ventes ferdigstilt i slutten av februar.

I Sør-Afrika blir det gjort knuse- og mølleforsøk, mens SINTEF utfører bergmekaniske analyser som skal inngå i en helhetlig gruvemodell.
OldNick
09:37 07.04.2017
#18982

NOM.OAX: Successful private placement in Keliber

Børsmelding
21.03.2017

Nordic Mining's associated lithium company Keliber Oy ("Keliber") has successfully concluded a private placement with gross proceeds of EUR 5.0 million. A subsequent repair issue will be carried out in March/April 2017.

Keliber has successfully concluded a private placement with gross proceeds of EUR 5.0 million. The share issue was subscribed by four Finnish investors; i.a. the investment companies Osuuskunta PPO and Jussi Capital Oy. In total, 125,000 new shares have been allocated to the investors in the private placement.

Following the private placement Keliber has around 954.000 shares. The proceeds from the private placement will be used for the ongoing definitive feasibility study ("DFS"), the environmental permitting process related to the future operations, product marketing and commercial arrangements, and other activities in connection with the lithium project. The DFS is scheduled for completion in Q3-2017.

Subsequent of the private placement, Keliber will carry out a repair issue of up to 125,000 shares on the same terms and conditions as for the private placement and with subscription rights for the shareholders prior to the private placement. The subscription period for the repair issue will end 6 April 2017.

The abovementioned share issues were authorised by the general meeting in Keliber on 16 March 2017. The general meeting also resolved to carry out incentive issues for members of the management and the board. In total, 9.720 shares may be issued in connection with incentive schemes in 2017.

For further information please contact:
CFO Lars K. Grøndahl, telephone +47 9016 0941
Nordic Mining ASA
______

NOM.OAX: Nordic Mining participated pro rata in Keliber's repair issue

Børsmelding
07.04.2017

On 6 April 2017, Nordic Mining subscribed for shares in accordance with its allocated subscription rights in a repair issue in the associated lithium company Keliber Oy. Keliber's repair issue closed for subscription on 6 April, and allocation of shares is expected on or about 10 April 2017.

In total 125,000 shares were offered for subscription at a price of EUR 40 per share in Keliber's repair issue. The repair issue was carried out subsequent of a successful private placement in March. The number of shares offered and the subscription price in the repair issue was the same as in the private placement.

The repair issue shares were offered to shareholders who did not participate in the private placement.

In the repair issue, Nordic Mining subscribed 31,338 shares, in accordance with its rights, at a price of EUR 40 per share. Consequently, Nordic Mining expects to be allocated the subscribed number of shares. Nordic Mining's new shareholding in Keliber will be informed after the board's approval of the allocation on or about 10 April 2017.

CEO Ivar S. Fossum comments: "Keliber is making very good progress with the definitive feasibility study and other value increasing activities. Lithium demand growth continues on a strong and positive note, and Keliber is in a lead position for the exciting development in the battery value chain and "green" energy solutions in Europe and in the Nordic region."

For questions please contact:
CFO Lars K. Grøndahl, telephone +47 9016 0941
Nordic Mining ASA
renud
10:53 07.04.2017
#15235

Spørsmålet er da hvor mye som er igjen i den allerede slunkne kassen, spesielt ettersom ferdigstillelsen av PFS-Engebø ble utsatt fra Q2 til Q3.

Det er uhyre sjeldent at betalingsvillige partnere går inn i gruveprosjekt før etter ferdigstilt DFS (også kalt BFS), slik at NOM høyst sannsynlig vil måte kjøre enda (minst) en emisjon til for å komme i mål med den. I NOM's sko, hadde jeg kjørt den emisjonen umiddelbart, før kursen faller enda mer tilbake og utvanningen dermed økes.
Akilles
09:24 10.04.2017
#6244

Den kan stige fremover på håpet om at Erna har fått "napp" hos kineserne.
De skal ha hatt med en prøve fra Engebø i kofferten. (men den var neppe så stor at de unngår emisjon:)
OldNick
15:21 11.05.2017
#19082

NOM.OAX: 2016 Annual Report (PDF)
______

NOM.OAX: Nordic Mining's interim report per 31 March 2017

Børsmelding
11.05.2017

Enclosed please find Nordic Mining's interim report for the first quarter 2017. The interim report and company updates will be presented tomorrow, Friday 12 May 2017 at 10.00 in the company's office at Vika Atrium, Munkedamsveien 45 (Entrance A, 5th floor), N-0250 Oslo.

Important events in the first quarter 2017 and year-to-date:

Corporate overview

* Profitable first quarter due to upgrade of Keliber value

In Q1-2017, the total net result for the Group was positive. The net profit from the associated company Keliber amounting to NOK 10.2 million was higher than the Group's operating loss. The positive result from the associated company is explained from reversal of previous impairment and a profit resulting from recent equity issues in Keliber where Nordic Mining's shareholding were reduced (deemed disposal).

* Fully financed for planned development activities in 2017

' Value increasing feasibility studies well under way

The ongoing feasibility studies for the Engebø rutile and garnet project (pre-feasibility study - PFS) and the Keliber lithium project (definitive feasibility study - DFS) are important ongoing value increasing activities. Both studies will be completed in the second half of 2017.

Engebø rutile and garnet project

* Mining and processing planning based on two attractive minerals

The Engebø project will be developed as a dual mineral operation with rutile and garnet, providing strategic and commercial strength and flexibility.

* Crushing and grinding circuit defined

A comprehensive and systematic test program has been completed, and the chosen crushing and grinding setup demonstrates high performance in terms of mineral liberation and operational parameters.

* Significant progress in rutile process test work

The test work program has achieved a rutile product of 95% TiO2 at recoveries exceeding 50%. Work is ongoing to improve the recovery even further whilst maintaining product quality. The process solution is based on industry standard process technology, combining methods such as magnetic, gravimetric and electrostatic separation.

* Garnet optimisation test work ongoing

Garnet production is divided in coarse and fine product streams. Fine garnet products have been produced to market specifications, and focus is now on developing the coarse garnet production flowsheet.

* Improved market outlook for rutile and garnet

Product prices for titanium feedstock, including rutile, has increased over the last months. Going forward, the supply/demand balance is expected to further tighten, and the price outlook is positive. The garnet market is developing and the demand growth in the coming years is expected to be higher than the general growth of the global economy (GDP).

* Increasing production and sales potential for Engebø garnet

Updated market perspectives for garnet indicate that the long-term sales target for the Engebø project will exceed the previously communicated level of 200,000 tonnes per annum.

Endret 11.05.2017 15:22 av OldNick
OldNick
15:22 11.05.2017
#19083

Keliber lithium project

* Positive lithium market development

The lithium market is developing positively, and product prices have increased. The demand for lithium in various applications is growing fast, in particular related to batteries for electric/hybrid vehicles and energy storage where the expected annual growth rate in the coming years is estimated at a level of 14% (Roskill). Contract prices for lithium carbonate have generally doubled in 2017 compared to 2016. Going forward, a tight market balance for battery grade lithium carbonate is expected. Current spot prices in China are reported to be well above the indicated contract level of USD 13 - 14,000 per tonne.

* Good progress on definitive feasibility study

A comprehensive work program is ongoing related to the definitive feasibility study (DFS) which is aiming to provide a solid foundation for the subsequent project financing to implement the lithium project.

* Construction start in 2018

Keliber's current plan targets completion of the ongoing permitting process and start of construction in 2018.

* Financing of project development work

In March 2017, Keliber executed a private placement with gross proceeds of EUR 5.0 million. A repair issue was executed in April, also with gross proceeds of EUR 5.0 million. In addition, an incentive share issue for board members was completed in April with proceeds of EUR 0.1 million. Nordic Mining participated pro-rata to its shareholding in the repair issue. Following from the equity issues year-to-date in Keliber, Nordic Mining's shareholding is approximately 22%.

Other

* Completion of second tranche of private placement

In January 2017, Nordic Mining completed the second tranche of the private placement which was initiated in December 2016. The gross proceeds were around NOK 6.9 million. The second tranche of the private placement was approved by the extraordinary general meeting on 10 January 2017.

* Annual report 2016

Nordic Mining's annual report for 2016 was published 24 April 2017.

* Ordinary general meeting

The ordinary general meeting in Nordic Mining will take place on 23 May 2017.

For further information, please contact:
CFO Lars K. Grøndahl Tel: +47 9016 0941

Oslo, 11 May 2017
Nordic Mining ASA


NOM.OAX: Q1-2017 Report (PDF)
tjuagutt
09:01 29.08.2017
#4523

Ting begynner å skje og Keliber er sikker på gruvedrift:

http://https://svenska.yle.fi/artikel/2017/08/29/kelibers-vd-det-blir-en-litumgruva-i-kaustby

Endret 29.08.2017 09:03 av tjuagutt
tjuagutt
09:03 29.08.2017
#4524

feil

Endret 29.08.2017 09:02 av tjuagutt
tjuagutt
18:28 15.09.2017
#4531

DFS Keliber utsatt til Q1 2018
Akilles
08:21 30.10.2017
#6253

refeasibility study substantiates profitable rutile and garnet operation at Engebø

Nordic Mining ASA ("Nordic Mining") has completed the prefeasibility study
("PFS") for the Engebø rutile and garnet project ("the Project"). The study
substantiates a profitable business case and supports further progress of the
Project. Main PFS results and information are provided in this release and in
separate attachments. Nordic Mining will host an open presentation and a
telephone conference later today to present the results from the PFS.
Key PFS outcomes
The main results and Project characteristics presented in the PFS are:

· Robust dual-mineral operation with production of high-quality rutile and
garnet


· Attractive Project financials:
· Pre-tax NPV@8% of USD 332 million
· Pre-tax IRR 23.8%
· Pay-back period: < 5 year


· Upside potential for a NPV@8% up to USD 465 million for a scalable concept
with increased capacity (staged expansion), higher sales volumes and utilisation
of inferred mineral resources


· Substantially reduced upfront capital cost; USD 207 million for the initial
1.5 mtpa operation

· 16 years of open pit mining followed by 13 years underground; potential
extension of mine life by mining of large inferred resources to the east and
west of the deposit, and to the depth

· Low cost operation due to outcropping, high-grade mineral deposit,
low stripping ratio, geotechnically stable orebody, limited transportation costs
and good product recoveries


· First quartile revenue-to-cost position for rutile compared with global
titanium feedstock industry


· Favorable location at tidal waters and efficient logistics for European and
overseas markets

· Zoning plan and environmental permit fully granted

· The PFS supports further Project progress towards production

Comments from Nordic Mining

Chairman of the Board Tarmo Tuominen comments:
"The Board of Nordic Mining intends to develop the Engebø rutile and garnet
project into a sustainable mining and processing operation. The PFS clarifies
important aspects of the project, and we look forward to progress towards
investment decision and production of high-quality rutile and garnet."

CEO Ivar S. Fossum comments:

"We are pleased to have reached this important milestone for the Engebø project.
The PFS results indicate an attractive and robust business case. The PFS process
has reduced important risks and moved the project closer to realisation. The
unique characteristics of the orebody with two major minerals, rutile and
garnet, provides a solid commercial framework.
The operating costs are low due to the efficient mining and processing methods
that the project allows for. The project concept is flexible and can be
developed further to realise, in whole or part, a 40% upside potential to the
estimated NPV of USD 332 million.
Rutile and garnet products from Engebø will have a strong competitive position
and favorable shipping to European and overseas markets. For the growing garnet
market, we will be the first producer in Europe.

The Engebø project is based on high standards for health, environment and safety
and the regulatory framework established in the approved zoning plan and the
environmental permit for the project. In this respect, the PFS report presented
today is a "PFS Plus version" as the fundamental regulatory permits are in
place.
The PFS process has been a comprehensive exercise, and we thank all the
professional contributors for their efforts and support in developing the
business case outlined in the PFS."


Project development going forward
The positive results from the PFS supports further progress for the Project.
This may in turn result in a need for additional funding for pre-construction
activities and general corporate expenditures, preliminary indicated at a total
level of approximately USD 20 million.
The company has initiated a process to evaluate the potential funding need and
to explore various options in this respect, for which Carnegie and Swedbank are
engaged as advisors for Nordic Mining.

Attachments and PFS presentations
The executive summary of the PFS report is enclosed in this release. The full
PFS report including its assumptions and risks will be available on Nordic
Mining's webpage www.nordicmining.com.

Please also find enclosed a management presentation of the PFS. Nordic Mining
will host an open presentation (in Norwegian) to be held in the company's office
in Oslo (address: Vika Atrium, Munkedamsveien 45, entrance A, 5th floor) at
11:00 CET today. We invite investors, analysts and media to attend the
presentation. Please give notice of participation by email to
post@nordicmining.com or telephone +47-90160941.

Further, a conference call in English will be hosted at 15:00 CET today to
present the PFS study followed by a Q&A session. A recording of the call will be
made available on www.nordicmining.com.

Dial-in details for the conference call (in English):
Conference ID: 1065758

Direct line Norway: +47 2350 0296
Direct line UK: +44 (0)330 336 9411
Direct line USA: +1 323 794 2093
Other locations: Choose one of the above

A replay will be available from 30 October at appr. 18:00 CET.

Replay phone number: +47 2350 0077
Replay passcode: 1065758



Ekstern link: http://www.newsweb.no/index.jsp?messageId=437434

Nyheten er levert av OBI.

Utforming | Hjelp | Utskrift | Bytt til sanntid Ingen åpne markeder
Akilles
09:12 30.10.2017
#6254

Tja, her var det nok mange som hadde ventet en bedre pris utvikling etter denne PFS meldingen. Men jeg vil tro at denne setningen ligger en vis demping på stemningen ?:

The positive results from the PFS supports further progress for the Project.
This may in turn result in a need for additional funding for pre-construction
activities and general corporate expenditures, preliminary indicated at a total
level of approximately USD 20 million.

Endret 30.10.2017 09:21 av Akilles
renud
09:23 30.10.2017
#16640

Akilles
Emisjonen kommer garantert, men ikke nødvendigvis umiddelbart. Da er det ikke umulig at NOM begynner å stige på innholdet i PFS'en, som er eksepsjonelt godt

Hele meldingen kan enklest oppsummeres med dette: "Pay-back period: < 5 year ",
noe som er hinsides alle tidligere forventninger og helt uvanlig på så store prosjekter. Har derfor økt en god del på fallet etter open.
Akilles
09:58 30.10.2017
#6255

Jeg tror det var mange som ventet på denne "gode nyheten" for og selge seg ut av aksje. Derfor burde de ventet med finansierings behovet til senere, slik at de som ville ut av aksjen hadde fått en kjangs. Nå er de innestengt og kommer til å presse prisen ned frem til finansieringen er over. Så her kan de bli billige aksjer?
Akilles
08:49 20.11.2017
#6260

Avtale

ordic Mining ASA ("Nordic Mining") has signed a Heads of Agreement with The
Barton Group ("Barton") related to offtake and commercial cooperation for garnet
from the Engebø rutile and garnet project. Barton is a leading US garnet
producer and distributor with a strong foothold, particularly in the North
American markets. Over the years, Barton has played a leading role in developing
the fast-growing application of waterjet cutting technology where garnet is the
dominant mineral.

Barton will be an industrial anchor investor in the pre-construction financing
for the Engebø project and subsequently in the construction financing to
establish the rutile and garnet operation.
Savepig
13:16 20.11.2017
#546

Det man ser her er at nå som prosjektet er grundig utredet kommer de gamle og lange pengene sigende.

Akilles
23:11 21.11.2017
#6261

Nå når de har fått en partner, så er vel tiden inn til å få aksjen over på hovedlisten for og få opp volumet på omsetningen?
Det er vanskelig å se noen nedside i denne aksjen fremover.
gadus
13:04 13.12.2017
#1

Se denne. Et av framtidas verdiskapingsbein vi skal stå på.

http://www.nordicmining.com/getfile.php/135565/Filmer/Nordic%20Mining_Edit_Draft05_HD.mp4
gadus
13:00 14.12.2017
#2

Fortsetter med denne.
http://www.geo365.no/bergindustri/fra-prosjekt-til-langsiktig-eksportindustri/
Varsling på tema     Varsling på stikkord




StockTalk er en tjeneste levert av Kreateam Consult AS. Orgnr. 911 839 806 MVA
Adresse: Postboks 39 Holmlia, 1201 Oslo. Email: st@stocktalk.no Tlf. 40 07 31 70
Kontakt oss | Hjelp | Regler | Sett som startside | Legg til favoritter